Client
Amgen
Value
€1,500,000
Programme Duration
4 Months
Completion Date
October 2013
Location
Dun Laoghaire
Project Managers
Flour Sisk
Design Team
Jacobs Engineering
Quantity Surveyors
Flour
Project Type
New Build MFL Wall
Scope
Design, supply, install & certify cantilevered Maximum Foreseeable Loss Wall
Design Package
Auto CAD
In 2015 Biopharmaceutical giant Amgen has opened its new US$300m facility in Dun Laoghaire. The development included the construction of an 11,500sqm production plant and a 5,800sqm cold chain warehouse Modubuild worked with Amgen, Jacobs & FM Global to pioneer the first of it’s type cantilevered MFL wall. The wall was designed to provide IE240 min fire rating, to be independent structure and to withstand seismic movement, impact and explosion. Constructed using structural steel & Promat 9.5mm Durasteel the entire wall was build in 12 weeks.
Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry’s standard dummy text ever since the 1500s.