Project Details

Client

Amgen

Value

€1,500,000

Programme Duration

4 Months

Completion Date

October 2013

Location

Dun Laoghaire

Project Managers

Flour Sisk

Design Team

Jacobs Engineering

Quantity Surveyors

Flour

Project Type

New Build MFL Wall

Scope

Design, supply, install & certify cantilevered Maximum Foreseeable Loss Wall

Design Package

Auto CAD

In 2015 Biopharmaceutical giant Amgen has opened its new US$300m facility in Dun Laoghaire. The development included the construction of an 11,500sqm production plant and a 5,800sqm cold chain warehouse Modubuild worked with Amgen, Jacobs & FM Global to pioneer the first of it’s type cantilevered MFL wall. The wall was designed to provide IE240 min fire rating, to be independent structure and to withstand seismic movement, impact and explosion. Constructed using structural steel & Promat 9.5mm Durasteel the entire wall was build in 12 weeks.

“Quote Needed”

– Client Representative

Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry’s standard dummy text ever since the 1500s.

Like What We Do?