Project Details

Client

National Gallery of Ireland

Completion Date

September 2016

Location

Merrion Square, Dublin

Project Managers

John Paul Construction

Design Team

Henegan Peng

Quantity Surveyors

John Paul Construction

Project Type

Refurbishment

Scope

Design, supply & installation of High Security, Ballistic resistant and Fire rated door sets

Design Package

Auto CAD

The 150 year old building has recently undergone extensive refurbishment. The project involves an upgrade of the two historic wings to current standards of fire detection and suppression, and the installation of electrical and energy efficient lighting systems. It will also see the introduction of essential modern environmental and air conditioning control systems to maintain the optimum climate for the collection.

“Quote Needed”

– Client Representative

Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry’s standard dummy text ever since the 1500s.

Like What We Do?